Please wait...

SSC CGL 2025 Aptitude Test - 1
Menu grid icon
Result Result point icon
SSC CGL 2025 Aptitude Test - 1
  • Goals icon

    /

    Score
  • Trophy icon

    -

    Rank
White alarm icon Time Taken: -
Result frame illustration
  • Question 1/10
    2 / -0.5

    A invested an amount of x rupees in a bank at compound interest for 2 years which gave 5% interest in year 1 and 6% interest in year 2. The amount received after 2 years is Rs 24,486. What is the value of x?

    Solutions

    Let's solve this step by step.

    Step 1: Write compound interest formula

    Here,

    Step 2: Simplify

    So,

    Step 3: Divide

    Answer: 22000

  • Question 2/10
    2 / -0.5

    Find the value of x.

    Solutions

  • Question 3/10
    2 / -0.5

    If a(a + b + c) = 45, b(a + b + c) = 75 and c(a + b + c) = 105, then what is the value of (a 2+ b 2+ c 2)?

    Solutions

  • Question 4/10
    2 / -0.5

    Time taken by pipe P and Q to fill up the tank is 60/ 7 minutes and time taken to fill the whole tank when all three pipes are open is 300/ 23 minutes. Ratio of time taken by pipe P to fill up the tank and pipe Q is 3 : 4. Calculate time taken by Q and R to fill up the tank. (Pipe R is a drain pipe.)

    Solutions

    Given:

    Pipe P + Pipe Q = 60/7 minutes

    Pipe P + Pipe Q - Pipe R = 300/23 minutes

    Pipe P : Pipe Q = 3 : 4

    Formula:

    If time taken by pipe A to fill tank is ‘a’ minutes and by pipe B is ‘b’ minutes then total time taken to fill the tank t ⇒ (1/t) = (1/a) + (1/b)

    Calculation:

    Let, time taken by pipe P be X

    ⇒ Time taken by pipe Q = 4 × X/ 3

    ⇒ 7/ 60 = (1/ X) + (3/(4X))

    ⇒ 7/ 60 = (4 + 3)/4X

    ⇒ 7/ 60 = 7/4X

    ⇒ 60 = 4X

    ⇒ X = 15

    ⇒ Time taken by pipe Q = 20 (∵ 4 × 15/3 = 20)

    Let, time taken by pipe R be Y

    ⇒ 23/ 300 = (7/ 60) - (1/Y)

    ⇒ 1/ Y = (7/ 60) - (23/300)

    ⇒ 1/ Y = (35 – 23)/300

    ⇒ Y = 25 (∵ 300/12 = 25)

    Now finding time taken by Q and R to fill the tank

    ⇒ 1/ t = (1/ 20) - (1/25)

    ⇒ 1/ t = (25 - 20)/500

    ⇒ 1/ t = 1/100

    ⇒ t = 100/1 minutes

    ∴ it takes 100 minutes to fill the tank

    Time taken by two pipe to fill a tank is 60/ 7 = 8.57 min (approx.)

    Confusion Points

    Time taken by three pipe to fill a tank is 300/ 23 = 13 min (approx.)

    As three pipe together takes more time than two pipes.

    That means the one pipe drain pipe taking water out of tank.

    Hence, R time is been subtracted.

  • Question 5/10
    2 / -0.5

    At 46 km/h and 36 km/h, two trains of equal length are travelling in the same direction on parallel lines. What is the length of each train if the quicker train passes the slower train in 36 seconds?

    Solutions

    Given:

    Speed of train 1 = 46 km/h

    Speed of train 2 = 36 km/h

    Time to overtake = 36 seconds

    Concept:

    Relative speed = Speed of train 1 - Speed of train 2

    Distance = Speed × Time

    Length of the train = Distance/2 (since two trains of equal length are involved)

    Solution:

    ⇒ Relative speed = 46 km/h - 36 km/h = 10 km/h = 10 × 1000/3600 m/s (converted from km/h to m/s)

    ⇒ Distance travelled during the overtake = Relative speed × Time = 10 × 1000/3600 m/s × 36 s = 100 m

    ⇒ Length of each train = Distance/2 = 100/2 = 50 m

    Hence, the length of each train is 50 meters.

  • Question 6/10
    2 / -0.5

    Anup can row 33 km downstream and 35 km upstream in 8 hours. He can also row 44 km downstream and 28 km upstream in the same time. How much time (in hours) will he take to row 55 km downstream and 14 km upstream?

    Solutions

    Let's solve this step by step.

    Step 2: Form equations

    From first condition:

    From second condition:

    Step 5: Required time

    We need time for 55 km downstream + 14 km upstream:

    Answer: 7 hours

  • Question 7/10
    2 / -0.5

    Find the value of the given expression.

    Solutions

  • Question 8/10
    2 / -0.5

    8 workers can complete a work in (y+12) days, while 15 machines can complete the same work in (2y+6) days. If the efficiency ratio of a worker and a machine is 3 : 2, then in how many days will 6 workers and 3 machines together complete the work?

    Solutions

    Let's solve this carefully step by step.

    Step 1: Work done by 8 workers

    Answer: 15 days

  • Question 9/10
    2 / -0.5

    What number must be added to each of the numbers 8, 13, 26 and 40 so that the numbers obtained in this order are in proportion?

    Solutions

    We need to solve this step by step.

    Step 1: Condition for numbers to be in proportion

    Answer: 2

  • Question 10/10
    2 / -0.5

    A man starts running from point P at 11 : 00 a.m. with a speed of 10 km/hr. He runs for 2 hours and then takes a 1 hour rest. He continues this till he is caught by another man who starts at 2 : 00 p.m. from point P and runs non-stop at a speed of 15 km/hr towards the first man. At what time (in p.m.) will the first man be caught?

    Solutions

    Let's work it out step by step.

    First man schedule (starting 11:00 a.m.):

    • Runs 11:00–13:00 at 10 km/h → covers 20 km.

    • Rests 13:00–14:00 (position stays 20 km).

    • Repeats: runs 14:00–16:00 (another 20 km), rests 16:00–17:00, etc.

    So at 2:00 p.m. (14:00), when the second man starts, the first man is at 20 km and is starting a 2-hour run.

    Let t = hours after 2:00 p.m.

Close button icon
User Profile
-

Correct (-)

Wrong (-)

Skipped (-)


  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
Mockers logo Get latest Exam Updates
& Study Material Alerts!
No, Thanks
Arrow pointer icon
Click on Allow to receive notifications
Notification bell icon ×
Open Now