Please wait...
/
-
A train having a length of 500 m passes through a tunnel of 1000 m in 1 minute. What is the speed of the train in Km/hr?
Verify mobile number to view the solution
Total distance which have to be covered by the train =500+1000=1500m=1.5km Time =1 minute =1/60 hour
distance = speed x time 1.5=speed × 1/60
speed = 90km/hr
X is 5 ft tall and he notices that he casts a shadow that's 3 ft long. He then measures that the shadow cast by his school building is 30 ft long. How tall is the building?
The ratio of original height to height of shadow is 5 : 3
Therefore 3x = 30
x = 10
Hence , Height of building is 5 × 10 = 50 ft.
Working alone, A can do a job in 15 days and B can do the same job in 18 days. In how many days will the job be completed if both work together?
A can do a job=15 days and B can do the same job =18 days. (A+B)′ s1 day job = 1/15 + 1/18 = 6+5/90 = 11/90
They can complete the whole work in 90/11 days.
P is twice as efficient as Q. Q takes 12 days to complete a job. If both of them work together, how much time will they take to complete the job?
Let Q complete in x unit/day and P complete 2x unit/day.
Total work = days X
per day work =12× unit
P+Q takes = totalwork / perdayeffeciency = 12 / x+2x = 4days
find the value of
If ΔPQR and ΔLMN are similar and 1.5PQ = LM and MN=4.5cm, then is QR equal to:
AB is a chord of length 16 cm of a circle of radius 10 cm. The tangent at A and B intersect at a point P. Find the length of PA.
Michelle has the following data:14, 6, 12, 17, 21, 10, 4, 3. What is the range?
The difference between the highest and lowest observations in a
given data is called its Range.
14, 6, 12, 17, 21, 10, 4, 3
Range =21-3=18
Correct (-)
Wrong (-)
Skipped (-)